Skip to content

PD-03-463ECMA-A55.21.03.01

Hang-tab tuck top, snap-lock bottom carton (reverse, bottom on panel 3, top on panel 1)

ECMA A55.21.03.01. Top: a tuck lid with dust flaps, the back panel running on past the end into a hang tab with a euro slot for a peg hook. Bottom: a glue-free 1-2-3 snap-lock base closed by hand: two wings and a locking panel that hooks between them. The bottom closure hangs from panel 3 and the top from panel 1, so the two open towards opposite faces. Panels are counted from the glue joint, as the ECMA code counts them: panel 1 carries the joint and panel 3 is opposite it.

Drawing…
CutCreaseGlue area
Flat blank
—
Rule length
—
Area
—
Panels
—

Size & options

Dimensions
mm

Between 15 and 1,200

mm

Between 10 and 1,200

mm

Between 15 and 1,600

Flaps & tabs
mm

Between 0 and 80

mm

Between 0 and 1,200

mm

Between 0 and 200

mm

Between 0 and 30

mm

Between 0 and 25

mm

Between 0 and 400

mm

Between 0 and 20

Friction lock: the tongue's shoulders ride over the dust flaps and hold by friction. Slit lock: two slits on the tuck crease make the tongue's corners catch, so the end has to be pressed to open.

Production

Which hand the joint is on. It follows the gluer the job is booked on, and it mirrors the whole blank.

mm

Between 0.1 and 12

Features
mm

Between 18 and 200

mm

Between 0 and 40

deg

Between 25 and 65

mm

Between 2 and 200

mm

Between 3 and 120

mm

Between 0 and 600

mm

Between 0 and 400

Advanced settings+
mm

Between 0 and 30

mm

Between 0 and 6

mm

Between 0 and 12

mm

Between 20 and 90

mm

Between 0 and 30

mm

Between 0 and 12

mm

Between 0 and 20

mm

Between 0 and 20

mm

Between 0 and 30

Order this box
Request a quote

Our structural designers review the final dieline before production.